UB Clinton Hall Boiler Replacement

MLP was hired to replace the hot water systems for the University at Buffalo’s Clinton Hall dorms. All work needed to take place between graduation of 2016 and the fall semester of 2016 in order to supply heat and domestic water to the dorms. A majority of this project was modeled in CAD and prefabricated off-site in order to expedite the install process. Major issues and areas of concern could be discussed and resolved well ahead of on-site installation.

Recent Projects